We began with a hillside and a single rule: the land decides. Sixty-four homes placed where the ground already levelled out, and four-fifths of it left exactly as we found it.
VÉRDA is a contemporary way of living close to what matters: light, water, quiet and neighbours you chose.
- ResidencesAcross four types
- 64
- LandscapeForest, meadow and water
- 38ha
- Left unbuiltOf the total site
- 82%
- First homesPhase one, estimated
- 2028
All figures are illustrative.
The masterplan
Homes gather in three small neighbourhoods around a pond, a wellness pavilion and a long shared table. Select a place to see what is there.
Illustrative masterplan · not to scale

The Ridge
Fourteen private villas stepped along the highest contour, each turned a few degrees from its neighbour so that no terrace looks onto another.
- Homes
- 14 private villas
- Elevation
- 228–246 m
- Plot
- 1,900–3,200 m²
Inside a Private Villa
Stone, oak and glass, arranged around a courtyard. Every room opens to a terrace, and the terrace opens to the trees.
- Bedrooms
- 4–5
- Interior
- 420–560 m²
- Homes
- 14 in total
- Availability
- 5 available
Wellness & amenities
- I
Follow the land
Buildings sit along existing contours. No platform was cut that the hillside did not already suggest.
- II
Build low, build few
Nothing rises above the pine canopy, and four-fifths of the site stays as landscape.
- III
Three honest materials
Local limestone, oiled oak and lime plaster. They are left to weather and are expected to improve.
- IV
Light before form
Every plan began with a sun study. Rooms are placed by the hour in which they are used.
Location
A wooded hillside above the Atlantic, six minutes from a village bakery and forty-five from an international airport. Times are illustrative.
Development journey
- 01Complete
2023
Vision
Land assembled, ecological survey completed and the brief written: fewer homes, more landscape.
- 02Complete
2024–2025
Planning
Masterplan designed with the landscape architects and approved. Show villa detailed.
- 03In progress
2026–2028
Construction
Infrastructure and planting first. The Ridge and The Pavilion are under construction now.
- 04Upcoming
2028–2029
Completion
Phase one homes handed over from 2028; The Terraces follow in 2029. Dates are estimates.
Dates beyond the current phase are estimates and may change.
Private consultation
Meet an advisor, see the show villa and take the long path down to the water. Viewings are private and unhurried.